Looking down towards the Toutle River. 110 cu yds of sediment were dredged from the river by the Army Corps after the blast. They also built a retention structure to prevent the sediment from moving into the river again.
Looking down towards the Toutle River. 110 cu yds of sediment were dredged from the river by the Army Corps after the blast. They also built a retention structure to prevent the sediment from moving into the river again.
Comments
110 cu yds? Thousand or million? 110 is not a lot.
— Peter Hovell
Sorry. 110 million. http://en.wikipedia.org/wiki/Toutle_River
— Catherine Hovell